The specification was right. The project was wrong.

A specification can be compliant and still miss the mark. Without measurable success criteria, you deliver features, not outcomes.

02 NOVEMBER 20266 MINYASSINE ROGUI

A specification can be right on paper and wrong in reality. The project can follow the document, the deadlines, and even the budget. Yet it can leave the business pain untouched. The flaw is not only in execution. It lies in the very definition of success, which is too vague, too technical, or too late.

Features are not the same as outcomes

Routing, a connected CRM, a bot, monitoring. All of that can be delivered cleanly. It says nothing about wait time, repeat-contact rate, or customer effort. The specification then describes components. It does not describe the expected effect on the experience. That is where the project goes off track.

The logic is simple. A feature describes a capability. An outcome describes an observable change. If you ask for a tool without stating the indicator it must move, the team optimizes delivery, not impact. The project can therefore pass acceptance testing and fail in production. This is common when teams talk architecture, but never business thresholds.

Ask the vendor and the integrator a simple question: what must move for the customer, and by how much? If the answer stays technical, the contract is poorly framed. Demand one line per business indicator. AHT, FCR, CES, repeat-contact rate. Not intentions. Target values. Also ask: "What current performance level are you using as the baseline, and what minimum improvement are you committing to?" Without a starting point, the target is decorative. Finally, check that each work package states a success criterion. Otherwise, you have a list of deliverables, not proof of value.

A project can be delivered on time and still be useless. This happens when no one has written the expected outcome in measurable terms. Document compliance never replaces operational performance.

The starting point must be measured before the solution

You cannot manage improvement without a baseline. Yet many specifications arrive with targets and no starting picture. Then no one can prove a gain. No one can discuss a gap either. The project becomes a battle of opinions.

The pattern is well known. Without a baseline, each side can tell a different version of reality. The vendor will say the solution works. The business will say nothing has changed. The decision then rests on instinct, not facts. It gets worse when indicators are measured on different scopes or over non-comparable periods.

Put the starting situation on the same indicators as the target. Same measurement period. Same scope. Same definition. Otherwise, the comparison is wrong from the start. An AHT measured on one channel and a target set on another mean nothing. Also ask: "What measurement window are you using for the baseline, and who validates it?" If the answer is vague, so is the steering. Require a single table with the source, date, formula, and owner for each indicator. Without that, a 10% gap may be nothing more than a change in method.

Also ask for the source of truth. Who measures? How often? With what calculation method? If repeat-contact rate depends on a manual export, the debate will start at the first steering committee. An indicator without a shared calculation method is not a criterion. It is decoration.

Success must be decided by someone named

As the project moves forward, every decision drifts away from the business. Choices are made on technical options, vendor dependencies, and schedule constraints. Then the original intent disappears. You need a named, legitimate decision-maker who brings every choice back to the success criteria.

This role cannot be diffuse. It must be written down. Name, scope, decision power. That person decides whether a feature truly serves the expected outcome. Without them, the project optimizes delivery, not value. The risk is concrete: a team accepts a faster option because it reduces configuration effort, even though it degrades resolution rate or increases transfers. The project moves forward, but in the wrong direction.

Ask this question in committee: which decision today moves AHT, FCR, CES, or callback? If no one can answer, the discussion is off topic. The right reflex is simple: block the decision until the link to a target indicator is explicit. Also ask: "Who signs off on the final arbitration when the business and the integrator disagree?" If that answer does not exist, the project slides into permanent compromise. Finally, check that the arbitrator's name appears in the steering committee and the governance plan, not only in meeting minutes.

Acceptance testing must answer the business, not the catalog

During acceptance testing, teams often validate screens, flows, rules, and interfaces. That is not enough. The real question is elsewhere: what changed for the customer and for the agent? One page should be enough to say it. With numbers, not adjectives.

Acceptance testing is there to prove an effect, not just a function. If it only checks test cases, it confirms that the tool responds. It says nothing about the quality of the service delivered. That is where many projects go wrong: they confuse functional compliance with operational benefit. Yet a screen can be compliant and still lengthen handling time or multiply workarounds.

Require an acceptance format that compares before and after. Average handling time. Repeat-contact rate. First-contact resolution. Perceived effort. If the readout fits on a list of delivered features, the project is compliant and failed. The deliverable was produced. The outcome was not proven. Ask: "What evidence table are you presenting to show the gap between baseline and target?" Refuse final approval if the measurement is not reproducible. A clear sign of weakness is this: tests passed, but no figures on real usage after go-live.

Refuse any final approval without quantified proof against the criteria defined at the start. Ask for the same table at launch, halfway through, and then at acceptance testing. If figures are missing at one stage, the proof is already fragile.

A delivered feature is not an achieved outcome.

The contract must protect the outcome, not just the scope

The most common trap is this: you sign a scope, then hope for an effect. That is not an outcome contract. It is a means-based order. The text must therefore link each work package to a target indicator. Otherwise, the supplier can be flawless and the project can still miss the mark.

The contractual mechanism matters as much as the business wording. If the contract only covers deliverables, the supplier will be paid to produce, not to improve. If the contract links each work package to a baseline, a dated target, and a measurement method, it creates a verifiable obligation. Without that framework, disagreements arrive at acceptance testing, when it is already too late to correct course.

Add a simple clause: each work package must be tied to a business indicator, a baseline, and a dated target. Without that trio, no work package approval. Without work package approval, no move to the next stage. Also ask: "Which deliverable is rejected if the indicator does not improve by the agreed threshold?" If the answer is "none", the contract protects the schedule, not the value. Finally, check that the measurement method and acceptance threshold appear in the appendix, using the same wording as the steering committee.

Finally, ask what the vendor considers a failure. If it cannot say, the contract is too weak. A good specification does not only say what to deliver. It says what must have changed, and how to prove it.

THE AUTHOR

Yassine Rogui

President of ExpertiaX. 19+ years in contact centres. Formerly Orange Business, NTT DATA. Writes in French, sometimes in English, never in jargon.

LEARN MORE ABOUT YASSINE →

TO GO FURTHER

Receive the full checklist

The PDF summarising this article and the other 11 pitfalls. 6 pages.

Your data is processed in accordance with our privacy policy.